Fifteen days from today, on 30 November 2026, seven more groups of housing hazards fall under fixed legal repair deadlines in England. For every social landlord with homes in Kingston upon Thames, Surbiton, New Malden or Chessington, the question stops being whether a defect is "serious enough" and becomes whether it was investigated, written up and made safe inside the statutory clock. That is why an Awaab's Law Phase 2 surveyor, instructed early and reporting in a form that stands up in a dispute, is now part of basic compliance rather than a luxury [1].
Key Takeaways
- From 30 November 2026, Awaab's Law timescales extend from damp and mould to seven further hazard groups, including electrical hazards, falls, fire, excess cold, excess heat, structural collapse and domestic hygiene [1].
- Significant hazards must be investigated within 10 working days, with written findings to the tenant within 3 working days and safety works done within 5 working days of the investigation concluding. Emergencies must be made safe within 24 hours [1][2].
- The duties currently bind social landlords only. A power to extend to the private rented sector exists, but no date has been set.
- The RICS professional standard on surveyors acting as expert witnesses, 5th edition, also takes effect on 30 November 2026, raising the bar for any surveyor whose report ends up before a court [3].
What Phase 2 Changes on 30 November 2026
Awaab's Law is named after Awaab Ishak, who died in December 2020, aged two, after prolonged exposure to mould in his family's social housing flat in Rochdale. Phase 1 has applied since 27 October 2025 and covers damp and mould together with all emergency hazards other than overcrowding [4].
Phase 2 was announced by the Ministry of Housing, Communities and Local Government on 13 July 2026 under the Hazards in Social Housing (Prescribed Requirements) (England) (Amendment) Regulations 2026. Guidance and a hazards triage annex are on gov.uk [1][2].
From 30 November 2026 the same fixed timescales apply to:
- Electrical hazards
- Falls, on the level, on stairs and between levels
- Fire and explosions
- Excess cold
- Excess heat
- Structural collapse and falling elements
- Domestic hygiene, including pest infestations
Housing Secretary Steve Reed said: "Awaab's Law sends a clear message that tenants' health and safety can never be compromised." The government says around four million social housing tenants are covered [1]. Phase 3 is due in 2027 and will bring in all remaining hazards under the Housing Health and Safety Rating System (HHSRS), except overcrowding [1].
The timescales at a glance
| Stage | Deadline under Awaab's Law |
|---|---|
| Emergency hazard | Investigate and make safe within 24 hours |
| Significant hazard: investigation | Begin and complete within 10 working days of becoming aware |
| Written summary to tenant | Within 3 working days of the investigation concluding |
| Safety works | Complete within 5 working days of the investigation concluding |
| Longer-term or supplementary works | Begin within 12 weeks, or as soon as reasonably practicable |
Who is covered, and who is not
The regulations bind social landlords in England. The Renters' Rights Act 2025 contains a power to extend Awaab's Law to the private rented sector, but no commencement date has been set.
What a Compliant Awaab's Law Phase 2 Surveyor Investigation Looks Like
The 10-working-day window means a landlord needs someone competent to inspect against the HHSRS, which assesses 29 hazards under the Housing Act 2004, and to record findings in a form a tenant, an ombudsman or a judge can follow.
Who should inspect
Many Phase 2 hazards cut across trades: a bulging ceiling may be a structural, water and electrical risk at once. A chartered surveyor assesses the fabric as a whole, identifies cause rather than symptom, and flags where an electrician or structural engineer is needed. If you are unsure which inspection fits the problem, Kingston Surveyors' guide to what survey you need explains the options.
Damp, mould and the cause question
Damp and mould remain the most common trigger for excess cold and domestic hygiene findings. A competent inspection distinguishes condensation from penetrating and rising damp using moisture profiling, surface and air temperature readings, relative humidity and, where useful, thermal imaging, and records ventilation performance. The choice between a damp survey and a damp and timber report matters, because hidden timber decay often turns a damp complaint into a structural one.
Electrical, fall and structural hazards
Loose handrails, uneven steps, poor lighting on common stairways, sagging ceilings, loose render and defective balcony fixings all need to be inspected, photographed and triaged. Surveyors are used to reading movement in buildings, and the firm's explainer on how surveyors read crack patterns in UK homes shows the sort of analysis that separates a cosmetic crack from a falling-elements risk. Electrical warning signs such as scorched sockets, exposed wiring or water tracking towards fittings should be recorded and referred to a qualified electrician.
The three-working-day written summary
The written summary is the document most likely to be scrutinised later. It should state what was inspected and found, the likely cause, the hazard category, the safety work planned and its timing, and any longer-term works. Dated photographs, readings and a simple room plan turn a letter into evidence. Landlords who already use a schedule of condition format for their stock will find the discipline familiar.
What Tenants in Kingston Can Expect
Social tenants in Kingston upon Thames who report an electrical fault, a fall hazard, a cold home, a pest infestation or a structural defect from 30 November should expect:
- An investigation within 10 working days, or within 24 hours if the problem is an emergency.
- A written summary within 3 working days of the investigation finishing.
- Safety works within 5 working days of the investigation finishing.
- A start on longer-term works within 12 weeks.
Tenants should report in writing, keep copies, photograph problems with a visible date and note when inspections and works take place. If a landlord blames condensation on "lifestyle", an independent chartered surveyor's report is often the fastest way to settle the argument. Local inspection capacity is available through Kingston Surveyors' chartered surveyors in Kingston.
Surveyor Evidence in Disrepair and Housing-Conditions Claims
When deadlines are missed or works do not cure the problem, the dispute becomes a housing-conditions claim and the surveyor's evidence is central.
The legal framework
Section 11 of the Landlord and Tenant Act 1985 obliges landlords to keep the structure, exterior and installations in repair. Section 9A, inserted by the Homes (Fitness for Human Habitation) Act 2018, implies a term that the dwelling is fit for human habitation throughout the tenancy and brings prescribed HHSRS hazards into the fitness test, so a property can be unfit even where nothing is technically "in disrepair".
Single joint experts under the protocol
The Pre-Action Protocol for Housing Conditions Claims (England) encourages the parties to instruct a single joint expert surveyor rather than one each. That expert owes a duty to the court, not to whoever pays, and the report is usually the only technical evidence the judge sees. It must say what the defects are, what caused them, how long they have existed, what works are needed and whether the occupier's use of the property was the main cause or a minor factor.
CPR Part 35 and the new RICS standard
Every expert witness in England and Wales is bound by Part 35 of the Civil Procedure Rules and Practice Direction 35: the overriding duty is to the court and the report must carry the prescribed statement of truth. From 30 November 2026 the RICS professional standard "Surveyors acting as expert witnesses", 5th edition, takes effect alongside the Phase 2 regulations. Among other changes it requires experts to list their assumptions, give alternative conclusions where the legal assumptions are disputed, disclose any use of artificial intelligence or third-party work, and disclose where a large share of their instructions come from one client [3]. Reports that read as advocacy for one side risk being given little weight.
Readiness Checklist for Kingston Landlords and Managing Agents
- Stock-condition data. Identify homes with known electrical, heating, structural or pest issues and prioritise inspections before the deadline.
- Triage. Adopt the gov.uk hazards triage annex so that call handlers can tell an emergency from a significant hazard on day one [2].
- Inspection capacity. Line up chartered surveyors and specialist contractors who can meet 10-working-day and 5-working-day windows across SW London.
- Record-keeping. Standardise the written summary, store photographs and readings against the property file, and log every date.
- Decant planning. Know in advance where a household can go if a home cannot be made safe within the timescales.
Frequently Asked Questions
Does Awaab's Law Phase 2 apply to private landlords in Kingston?
Not yet. Phase 2 binds social landlords in England. A power to extend it to the private rented sector exists in the Renters' Rights Act 2025, but no date has been set.
Can a landlord use a maintenance operative rather than a surveyor for the investigation?
For straightforward defects an experienced operative may be enough. For cross-cutting hazards, disputed causes or anything likely to end in a claim, an Awaab's Law Phase 2 surveyor report from a chartered surveyor gives both sides evidence that withstands challenge.
What happens if the 10-working-day deadline is missed?
The tenant can hold the landlord to the implied term in the tenancy and, if the problem persists, bring a housing-conditions claim, where the missed deadline will be weighed as evidence.
Conclusion
The 30 November 2026 deadline is as much about evidence as repairs. Landlords who can show a dated inspection, a written summary within three working days and safety works within five will have met the law and protected themselves. Tenants who keep records and secure an independent report can prove what went wrong if deadlines slip. Kingston Surveyors provides HHSRS-aware condition and damp inspections and expert witness reports across Kingston upon Thames and south-west London. Landlords should use the next fortnight to audit stock data and inspection capacity; tenants should start reporting hazards in writing now.
References
- Safer Homes for 4m Tenants with Quicker Action on Dangerous Homes. gov.uk.
- Awaabs Law Phase 2 Guidance for Social Landlords. gov.uk.
- Rics 2026 Expert Witness Guidance Key Changes for Surveyors. rimkus.com.
- Awaabs Law in the Social Rented Sector. gov.uk.